Ge xr 6000 service manual
GE Healthcare gehealthcare. Views Downloads 77 File size 9MB. All rights reserved.
All rights reserved. The material presented and contained herein may not be reproduced in any form or manner, without the written permission of General Electric Company, Inc. Whether noted or concealed, damage MUST be reported to the carrier immediately upon discovery, or in any event, within 14 days after receipt, and the contents and containers held for inspection by the carrier. A transportation company will not pay a claim for damage if an inspection is not requested within this 14 day period. At this time be ready to supply name of carrier, delivery date, consignee name, freight or express bill number, item damaged and extent of damage. Accordingly, the instructions herein contained should be thoroughly read and understood by everyone who will use the equipment before you attempt to place this equipment in operation.
Ge xr 6000 service manual
GE Healthcare gehealthcare. All rights reserved. The material presented and contained herein may not be reproduced in any form or manner, without the written permission of General Electric Company, Inc. Whether noted or concealed, damage MUST be reported to the carrier immediately upon discovery, or in any event, within 14 days after receipt, and the contents and containers held for inspection by the carrier. A transportation company will not pay a claim for damage if an inspection is not requested within this 14 day period. At this time be ready to supply name of carrier, delivery date, consignee name, freight or express bill number, item damaged and extent of damage. In addition, electrical feeds into the Power Distribution Unit shall be performed by licensed electrical contractors. Other connections between pieces of electrical equipment, calibrations and testing shall be performed by qualified GE Healthcare personnel. The products involved and the accompanying electrical installations are highly sophisticated, and special engineering competence is required. In performing all electrical work on these products, GE will use its own specially trained field. The purchaser of GE equipment shall only utilize qualified personnel i. Accordingly, the instructions herein contained should be thoroughly read and understood by everyone who will use the equipment before you attempt to place this equipment in operation. The General Electric Company, Healthcare Group, will be glad to assist and cooperate in placing this equipment in use.
Cassette Tray 9. Validation Use [W] to validate all values for a given function appearing on the screen.
Views Downloads 91 File size 22MB. All rights reserved. The material presented and contained herein may not be reproduced in any form or manner, without the written permission of General Electric Company, Inc. Whether noted or concealed, damage MUST be reported to the carrier immediately upon discovery, or in any event, within 14 days after receipt, and the contents and containers held for inspection by the carrier. A transportation company will not pay a claim for damage if an inspection is not requested within this 14 day period. At this time be ready to supply name of carrier, delivery date, consignee name, freight or express bill number, item damaged and extent of damage.
GE Healthcare gehealthcare. All rights reserved. The material presented and contained herein may not be reproduced in any form or manner, without the written permission of General Electric Company, Inc. Whether noted or concealed, damage MUST be reported to the carrier immediately upon discovery, or in any event, within 14 days after receipt, and the contents and containers held for inspection by the carrier. A transportation company will not pay a claim for damage if an inspection is not requested within this 14 day period.
Ge xr 6000 service manual
This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA. Home current Explore.
Houses for sale berkhamstead
Remove trash, remove installation equipment and tools, clean up room and store service manuals. Based on context. Refer to Chapter 4 - Functional Checks - 3. Generator Phase Definition Install X-ray tube. The No1 Cable should be routed inside the right side cover. Note: This equipment generates, uses, and can radiate radio frequency energy. Route the cable through cable supporting bracket to the tube side. Remount the cover at the bottom of the front surface of the cassette holder. Rotate the tube facing to the wall stand front panel. For Digital table place 3. Inverter exposure. Figure Route the ion chamber cable as Fig arrow shown.
.
Also, verify that all the manuals are present in the binders according to the Table of Contents. Paragraphs preceeded by a symbol e. Acquire an AEC exposure. Page 50 Section 4. Although this apparatus incorporates a high degree of protection against x-radiation other than the useful beam, no practical design of equipment can provide complete protection. Notice the mark placed on the tube stand and chose desired SID. When the optical densities have been entered, the software calculate the parameters for the next exposure regarding the result of the previous ones AEC signal from ionization chamber and optical density. Run the proposed exposures 0. Set 80 kV, 20 mAs backup, wall stand mode, center cell of ion chamber selected, and take an exposure. Have the sample images been installed on the system? Power On Diagnostics Connect the other end of the connector to the 24V power supply of the PDU. Used to make the reader aware that the paragraph s that follow are examples of information possibly stated previously.
Between us speaking, in my opinion, it is obvious. I will not begin to speak on this theme.